Ahtna Design-Build, Inc. – Construct MCCS Warehouse – Bridgeport

Project: 2021 – 2022 Construct MCCS Warehouse – Bridgeport Description of Work: Performed support work for a pre-engineered metal building on Marine base: demolition and disposal of existing materials, placed graded and compacted aggregate base, and poured concrete. Trenched, bedded, backfilled, and compacted all trench lines. Installed conduit, water line, and storm drain. Completed approx.…

Air Tech Services – MGM Grand Laundry

Project: MGM Grand Laundry Description of Work: Saw cut and performed demolition of concrete. Completed dig out of two trenches to connect to existing systems and backfilled concrete over once work complete. Installed 8’ x 8’re-use water pit. Formed and installed approximately 65 yards of new concrete slab and trench drains. Installed new precast tank.…

American Pacific Borates – Ft. Cady – Pad Building

Project: 2021 Ft. Cady – Pad Building Description of Work: WMW2 (short hole) program drill pads and tortoise fence install. Contract Number: 62-2021-100 Type of Contract: Prime Contract Agency or Company Work Performed For: Fort Cady California Corporation (FCCC) / American Pacific Borates Address of Agency or Company: 9329 Mariposa Rd., Suite 210, Hesperia, CA…