Station Electric – Super 10 Trucking

Project: 2021 Super 10 Trucking Description of Work: Super 10 trucking and disposal support for work at, and equipment hauling between, substations throughout Southern California year-round. Contract Number: N/A Type of Contract: Subcontract Agency or Company Work Performed For: Station Electric Address of Agency or Company: 33 Hammond St., Suite 211, Irvine, CA 92618 Initial…

Peraton Inc. – Ft. Irwin – G97 Carpet/Flooring

Project: 2019-2021 Ft. Irwin – G97 Carpet/Flooring Description of Work: Removal of existing flooring, repairs to subflooring, and installation of new floor tile at the MARS site building G97 at the Goldstone Deep Space Communication Complex at Ft. Irwin. Contract Number: G207024MS Type of Contract: Prime Contract Agency or Company Work Performed For: Peraton Inc.…

Station Electric – Trucking

Project: 2020 Trucking Description of Work: Super 10 trucking and disposal support for work at, and equipment hauling between, substations throughout Southern California year-round. Contract Number: N/A Type of Contract: Subcontract Agency or Company Work Performed For: Station Electric Address of Agency or Company: 33 Hammond St., Suite 211, Irvine, California 92618 Initial Contract Amount: T&M…

Department of Veterans Affairs – Kitchen Pipeline Replacement at Veterans Home – Barstow

Project: 2020 Barstow Cal Vet – Kitchen Pipeline Replacement Description of Work: Performed kitchen pipeline repair at the Veterans Home – Barstow. Contract Number: N/A Type of Contract: Prime Contract Agency or Company Work Performed For: Department of Veterans Affairs Address of Agency or Company: Office of Procurement & Contracting, 1227 “O” Street, Room 100, Sacramento, CA…

Department of Veterans Affairs – Hydronic Loop – Phase 2 at Veterans Home – Barstow

Project: 2020 Barstow Cal Vet – Hydronic Loop – Phase 2 Description of Work: Excavated dirt, asphalt, and concrete to expose approx. 125’ of the hydronic loop system. Replaced approx. 500 ‘ of pipe and old connections (elbows, tees, valves) with new PVC valves and fittings. Poured/replaced kicker-block with slurry and installed vault. Backfilled, installed slurry,…