Trash Pick-Up – Indio, CA Southern California 4 Granite Inc.

North Wind – Trash Pick-Up – Indio, CA

Project: Trash Pick-Up – Indio, CA Description of Work: Removed trash from Bureau of Land Management land in Berdoo Canyon near Indio, CA and Dale Evans, CA and disposed of the debris. Recycled approximately 300 tires to an approved tire recycling vendor. Contract Number: 02764S.28 Type of Contract: Subcontract Agency or Company work performed for: North Wind, Inc. Address of…

Queen 2 – Calexico Tunnel Remediation Southern California 4 Granite Inc.

Eagle Eye Electric – Queen 2 – Calexico Tunnel Remediation

Project: Queen 2 – Calexico Tunnel Remediation Description of Work: Remediated a tunnel in Calexico, CA for the U.S. Customs and Border Protection under Eagle Eye Electric’s direction. Inserted a steel plate bulkhead into the tunnel and drilled bore holes through which backfilled the tunnel. Contract Number: GTS-1145030-4Granite Type of Contract: Subcontract Agency or Company work performed for: Eagle Eye…

Morgan Hill 6 | Southern California 4 Granite Inc.

City Ventures – Morgan Hill 6

Project: Morgan Hill 6 Description of Work: Excavated three UST (sumps/tanks) after they were cleaned (by others). Broke down (pieces smaller than 2”X2”) and removed stockpile remnants onto visqueen onsite. Contract Number: 6020-L-000019 Type of Contract: Prime Contract Agency or Company work performed for: City Ventures Address of Agency or Company: 3121 Michelson Drive, Ste. 150, Irvine, California 92612 Initial Contract Amount: $28,992.00…

Palmdale Aerospace Academy

Christianbelle Electric – Palmdale Aerospace Academy

Project: Palmdale Aerospace Academy Description of Work: Performed trenching – both skid steer trencher and mini excavator/backhoe throughout the year. Contract Number: N/A Type of Contract: Subcontract Agency or Company work performed for: Christianbelle Electric, Inc. Address of Agency or Company: 8104 I Avenue, Hesperia, California 92345 Initial Contract Amount: T&M – No Contract Final Contract Amount: $50,511.31 Customers Contact Name & Phone: David…

17 - Harbour Drive - Anderson Howard

Harbour Drive – Overhead Feeder

Project: Harbour Drive – Overhead Feeder Description of Work: Fabricated and installed a conduit support that was installed 20 feet above the ground. Contract Number: 700433-0015 Type of Contract: Subcontract Agency or Company work performed for: Anderson & Howard Electric, Inc. Address of Agency or Company: 1791 Reynolds Avenue, Irvine, CA 92614 Initial Contract Amount: $42,064.00 Final Contract Amount: $42,064.00 Customers Contact Name…

15 - GAFB - CBI

Former George Air Force Base Landfill Cover Project

Project: Former George Air Force Base Landfill Cover Project Description of Work: Repaired erosion on landfill caps. Contract Number: 201667 Type of Contract: Subcontract Agency or Company work performed for: CB&I Federal Services, LLC Address of Agency or Company: 1725 Duke Street, Suite 400, Alexandria, VA 2231 Initial Contract Amount: $62,032.00 Final Contract Amount: $317,849.30 – Increased Scope Customers Contact Name & Phone: David…

16 - Mech Room - Cal Vet

CalVet Barstow Mechanical Room Restoration

Project: CalVet Barstow Mechanical Room Restoration Description of Work: Completed the sampling, mold abatement and remediation, demolition, and restoration of a wall between a room and a mechanical/hot water room and all piping. Restored the wall to room specifications. Demolished and removed concrete floor in room. Sloped new concrete into the drain grate. Removed and replaced all…

14 - Pit Dewatering K5 - RTM

Rio Tinto Minerals – Dewatering K5

Project: Dewatering K5 Description of Work: Installed pipeline from K5 to TC2, near Plant 10. Contract Number: 3101520259 Type of Contract: Prime Contract Agency or Company work performed for: Rio Tinto Minerals, US Borax Inc. Address of Agency or Company: 14486 Borax Road, Boron, CA 93516 Initial Contract Amount: $32,025.00 Final Contract Amount: $32,025.00 Customers Contact Name & Phone: Quentin Vandal – (218) 341-1156

12 - P531 - RTM

Rio Tinto Minerals – P531 BAP Pond 6 LCRS Automation

Project: P531 BAP Pond 6 LCRS Automation Description of Work: Pumped liquid between BAP Ponds and installed piping (3,000 feet of 3” HDPE) and pumps. Purchased and installed evaporation system including docks, piping, and pumps. Installed tee and Y’s to route lines correctly. Flushed lines multiple times and washed build up off of dock at Pond. Stretched…