Department of Veterans Affairs – Hydronic Loop – Phase 2 at Veterans Home – Barstow
Project: 2020 Barstow Cal Vet – Hydronic Loop – Phase 2 Description of Work: Excavated dirt, asphalt, and concrete to expose approx. 125’ of the hydronic loop system. Replaced approx. 500 ‘ of pipe and old connections (elbows, tees, valves) with new PVC valves and fittings. Poured/replaced kicker-block with slurry and installed vault. Backfilled, installed slurry,…










