Rio Tinto Minerals – FCC Pond 6A1 Valve Pad and Pipeline
Project: FCC Pond 6A1 Valve Pad and Pipeline Description of Work: Installed bypass piping and valves: excavated, installed concrete valve pad, installed 2 – 8” HDPE lines, 10 – 8” knife valves, fused RTM pipe and route to pond inlet area. Procured rock and 200 yards of sand, fused pipe and installed drain liner. Hydrotested both the…










